    Hello All,

    We are in the process of converting our cost codes to CSI format from the non-traditional format we are currently using that make no sense at all. I was wondering if there were any GC's out there that are using CSI cost codes and wouldn't mind sharing their list with me? Or if anyone has any suggestions on how to begin to create an entirely new set of cost codes. Any help is appreciated! I am still fairly new the the construction industry and am struggling with this project.

    ------------------------------
    Kathryn Hodges
    Controller
    D.L. Bandy Constructors
    San Antonio TX
    (210)-519-0330
    Kathryn.hodges@dlbandy.com
    ------------------------------


  • 2.  RE: CSI Cost Codes

    Posted 08-07-2019 09:41
      |   view attached
    Hi Kathryn,

    Welcome to the construction industry!  I have worked for GC's for 18 years and have seen multiple lists of cost codes.  When I started with a brand new company and had to put together our own list I looked back and created a list based on a combination of all others.  I think it is a pretty comprehensive list and can easily be modified to anyone's needs.  Each code is 5 digits and the first two digits are the CSI code so it is easily identifiable for project managers, etc.  I have attached it for your use.  Hope it helps!

    ------------------------------
    Melissa Netherton
    Accounting Manager
    Brayton Construction
    Conroe TX
    (713) 447-9361
    ------------------------------

    Attachment(s)

    pdf
    Job Cost Codes.pdf   165K 1 version


  • 3.  RE: CSI Cost Codes

    Posted 08-07-2019 11:39

    We utilize Sage Contrator 100 and incorporated the new CSI Codes as our cost codes.  We set the old cost codes as "inactive" so they are still available for historical tracking but not current/active moving forward.  We took the entire list and cut it down to the numbers we use on a regular basis, adding a few odd ball codes we want to track.  We then made a short list of what our self-performing crews should utilize on a regular basis.  I have attached the 2 lists we use with our PM's and field personnel.

     

    Hope this helps! ��

     

    Kimberly M. (Beeler) Peterson

    Chief Financial Officer

     

    Direct: 262.252.7004 | Cell: 414.750.4444

    kpeterson@beelerconstruction.com | vCard

    N56 W16758 Ridgewood Dr. | Menomonee Falls, WI  53051

     

    Check out our NEW LOOK! www.beelerconstruction.com

     




    Attachment(s)